Bridges are marvels of civil engineering that symbolise connectivity and progress. Constructing a bridge is a multidisciplinary effort that combines geotechnical engineering, structural design, material science, and precise execution. This article breaks down bridge construction techniques step-by-step—from initial planning to final execution—highlighting key processes, challenges, and modern methods.
Planning and Feasibility Study
Site Selection and Survey
Before any design can begin, a detailed topographic survey, geological investigation, and hydrological study are conducted. The aim is to:
- Analyse terrain and river/valley profiles
- Assess soil and rock bearing capacity
- Study flood levels and water flow patterns
- Identify environmental and social constraints
Traffic and Load Analysis
Traffic data (AADT—Annual Average Daily Traffic) and predicted growth are used to define the load class of the bridge. This impacts design parameters such as lane width, live load, and safety factors.
Preliminary Design and Cost Estimation
Multiple conceptual bridge types are evaluated:
- Beam bridges
- Arch bridges
- Suspension bridges
- Cable-stayed bridges
- Truss bridges
Factors like span length, terrain, budget, and aesthetics guide the selection. A cost-benefit analysis helps finalise the most economical and feasible option.
Design and Approvals
Structural Design
The design process follows national or international standards (e.g., IRC, AASHTO, Eurocodes). Key design elements include:
- Superstructure: Girders, slabs, cables
- Substructure: Piers, abutments
- Foundations: Shallow or deep foundations (pile/caisson)
Software like STAAD Pro, MIDAS, or SAP2000 is used for finite element modelling and analysis.
Environmental and Statutory Clearances
Clearances must be obtained from:
- Environmental agencies (for EIA approval)
- Local municipalities
- Highway or railway authorities
- Land acquisition boards
Site Preparation and Foundation Works
Site Mobilization
Construction site setup includes:
- Access roads
- Temporary bridges or platforms
- Storage yards for materials
- Worker facilities
Foundation for Bridge Construction
Depending on geotechnical conditions, the foundation type varies:
- Open Foundation (spread footing): Used for firm soil
- Pile Foundation: Bored or driven piles for deep support
- Well Foundation or Caisson: Used in water bodies
Dewatering and cofferdams are often used for underwater foundation work.
Substructure Construction
The substructure transfers loads from the superstructure to the foundation. It includes:
- Piers: Vertical supports between abutments
- Abutments: End supports that also retain embankments
- Pier caps and Bearings: Distribute loads and allow movement
Reinforced concrete is commonly used, and formwork systems (steel or timber) are erected for casting.
Superstructure Construction
Cast-in-Situ Construction
Used for smaller spans or when prefabrication is impractical.
- Shuttering and scaffolding are assembled on-site
- Reinforcement is placed
- Concrete is poured and cured in stages
Precast Segmental Construction
- Segments are cast off-site in controlled conditions
- Transported and assembled using cranes or launching girders
- Post-tensioning cables are used to connect segments
Incremental Launching Method (ILM)
- The bridge deck is built in sections and launched over piers using hydraulic jacks
- Reduces the need for scaffolding in deep valleys or rivers
Balanced Cantilever Method
- Suitable for long-span bridges
- Segments are built outward from piers in a balanced fashion
- Often used in conjunction with precast segments
Suspension and Cable-Stayed Techniques
For long spans:
- Suspension bridges use main cables draped between towers
- Cable-stayed bridges have cables directly connected from the towers to the deck
Deck Finishing and Expansion Joints
Once the structural system is complete:
- The deck slab is waterproofed
- Expansion joints are installed to absorb thermal movements
- Parapets, crash barriers, and handrails are added
- Asphalt or concrete surfacing is applied
Quality Control and Safety
Material Testing
- Concrete cube strength
- Steel tensile strength
- Slump tests, compaction tests, etc.
Structural Health Monitoring (SHM)
Sensors, strain gauges, and deflection meters may be installed to monitor performance over time.
Safety Protocols
All site activities follow OSHA/IS code-based safety norms, including:
- PPE for workers
- Safe scaffolding and formwork practices
- Controlled lifting and transport of heavy elements
Final Inspection and Commissioning
Before opening to traffic, the bridge undergoes:
- Load testing (static/dynamic)
- Visual inspection for cracks, deflections, and workmanship
- Documentation and handover to the authorities
The bridge opened to the public only after safety clearance and final approvals.
Maintenance and Life-Cycle Management
Post-construction, regular maintenance is essential:
- Annual inspections
- Joint and bearing replacement
- Repainting and surface treatment
- Monitoring corrosion and fatigue
Bridge Management Systems (BMS) help track condition ratings and schedule rehabilitation works.
Important Code Books Used in Bridge Construction
Established standards and codes govern the design and construction of bridges to ensure safety, durability, and compliance. Below are some of the widely used code books across different countries:
🇮🇳 India – Indian Roads Congress (IRC) & BIS Codes
- IRC:5-2015 – Standard Specifications and Code of Practice for Road Bridges, Section I: General Features
- IRC:6-2017 – Code of Practice for Loadings for Road Bridges
- IRC:18-2010 – Design and Construction of Prestressed Concrete Road Bridges
- IRC: 21- 2000 – Standard Specifications and Code of Practice for Road Bridges in Plain and Reinforced Concrete
- IRC: 78- 2014 – Road Bridges: Foundation and Substructure
- IRC:83 – Bearings for Road Bridges (Parts I and II)
- IS 456:2000 – Code of Practice for Plain and Reinforced Concrete
- IS 1343:2012 – Code for Prestressed Concrete
- IS 1893 – Criteria for Earthquake Resistant Design of Structures (important for seismic bridges)
For more code books, click here
🇺🇸 United States – AASHTO Standards
- AASHTO LRFD Bridge Design Specifications – The most commonly used guideline for bridge design in the U.S.
- AASHTO Manual for Bridge Evaluation
- AASHTO Guide Specifications for LRFD Seismic Bridge Design
🇪🇺 Europe – Eurocodes
- EN 1990 – Eurocode: Basis of Structural Design
- EN 1991 – Actions on Structures (Traffic loads on bridges: EN 1991-2)
- EN 1992 – Eurocode 2: Design of Concrete Structures
- EN 1993 – Eurocode 3: Design of Steel Structures
- EN 1994 – Eurocode 4: Composite Steel and Concrete Structures
- EN 1997 – Eurocode 7: Geotechnical Design
- EN 1998 – Eurocode 8: Design for Seismic Resistance
🌐 International Guidelines
- FIP (Fédération Internationale de la Précontrainte) – Recommendations for prestressed concrete bridges
- ACI 343 – Design of Bridge Structures (by American Concrete Institute)
- BS 5400 – British Standard for Steel, Concrete, and Composite Bridges (still referenced in many countries)
How Codes are Used in Practice
- Preliminary Design: Refer to general features (IRC:5 or EN 1990)
- Load Calculations: Use IRC:6 or EN 1991
- Superstructure Design: IRC:21/18, IS 456/1343, or Eurocode 2/3
- Foundation and Substructure: IRC:78, IS 2911 (pile foundations)
- Seismic Design: IRC:6 (Annexure), IS 1893, or Eurocode 8
- Execution and QA/QC: Refer to relevant IS codes for materials and construction tolerances
Conclusion
Bridge construction is a testament to human ingenuity, requiring a meticulous blend of planning, engineering, and execution. From understanding site conditions to choosing the right construction technique, each stage influences the bridge’s durability, safety, and functionality. With advancements in materials, machinery, and design software, bridge building continues to evolve, offering new possibilities in infrastructure development.